LINE | Name | Country | City | Regional Rail | |||
Line 3 extension to SW | IR | Tehran | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2012 | 2014 | 12.0 | 12.0 | 100% | 11* | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
20000000.0 | IRR | 0.0 | 2013 | 2400.0 | 200.0 | Trade | |
REFERENCE | https://www.railjournal.com/passenger/metros/tehran-opens-metro-line-3-extension/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Source says 10, but there are 11 stations listed on Wikipedia. |
||||||
Go to Tehran city page. |