LINE Name Country City Regional Rail
Green Line IL Tel Aviv No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2024 38.6 4.6 12% 62* Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
20000.0 NIS 0.27 2020 5360.0 138.9 Media
REFERENCE http://www.xinhuanet.com/english/2019-05/21/c_138075072.htm
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Only 4 underground.
Go to Tel Aviv city page.