LINE Name Country City Regional Rail
Fukutoshin Line JP Tokyo No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2001 2008 8.9 8.9 100% 8 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
250000.0 JPY 0.01 2004 1850.0 207.9 Media
REFERENCE https://www.japantimes.co.jp/news/2008/06/12/national/fukutoshin-subway-line-debuts/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Tokyo city page.