LINE | Name | Country | City | Regional Rail | |||
Haneda express line | JP | Tokyo | Yes | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2022 | 2029 | 5.6 | 5.6 | 100% | 2 | Measured | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
300000.0 | JPY | 0.01 | 2025 | 3000.0 | 535.7 | Media | |
REFERENCE | https://en.connectionjapan.com/2019/02/16/jr-east-construira-linha-para-ligar-toquio-ao-aeroporto-de-haneda/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Tokyo city page. |