LINE Name Country City Regional Rail
Sotetsu Shin-Yokohama Tokyu Line JP Tokyo Yes
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2010 2022 10.0 8.0 80%* 2 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
290800.0** JPY 0.01 2016 2762.6 276.3 Trade
REFERENCE https://www.decn.co.jp/?p=89391
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Figure is approximate – there’s a bit of elevated running at both ends, though both new stations (Shin-Yokohama, Shin-Tsunashima) are underground.
** Source says 402.2 billion across this project and the JR line, the figure 290.8 billion is by subtraction.
Go to Tokyo city page.