LINE Name Country City Regional Rail
Yurikamome JP Tokyo No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1988 1995 12.0 0.0 0% 12 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
170200.0 JPY 0.01 1991 919.1 76.6 Trade
REFERENCE http://www.ejrcf.or.jp/jrtr/jrtr30/pdf/s42_aok.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.