LINE Name Country City Regional Rail
Line 3 FR Toulouse No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2021 2025 27.0 16.2 60% 21 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2670.0 EUR 1.3 2016 3471.0 128.6 Plan
REFERENCE https://www.toulousemetro3.fr/le-projet/3eme-ligne.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Source has a slightly different length: https://www.ladepeche.fr/article/2017/03/07/2530341-prix-3e-ligne-metro-fait-toujours-polemique.html