LINE | Name | Country | City | Regional Rail | |||
Line 2 extension to Br�dno | PL | Warsaw | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2018 | 2022 | 4.0 | 4.0 | 100% | 3 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1,400.0 | PLN | 0.57 | 2020 | 837.0 | 209.2 | Trade | |
REFERENCE | https://www.railwaypro.com/wp/a-single-bidder-for-warsaw-metro-line-2-extension/ | ||||||
NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Warsaw city page. |