LINE Name Country City Regional Rail
Line 1 Phase 3 Hankou North CN Wuhan No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2013 5.7 0.0 0% 3 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2361.0 CNY 0.28 2011 670.1 117.6 Media
REFERENCE https://zh.wikipedia.org/wiki/%E6%AD%A6%E6%B1%89%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A1%E5%8F%B7%E7%BA%BF#%E4%B8%80%E6%9C%9F%E5%B7%A5%E7%A8%8B; http://www.whtpi.com/Service/22/1645.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.