LINE Name Country City Regional Rail
Line 7 Northern Extension CN Wuhan No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
33.6 13.6 40% 9 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
17559.0 CNY 0.24 2018 4176.7 124.3 Plan
REFERENCE http://www.gov.cn/xinwen/2019-01/06/5355294/files/c3d503decf1d4b6b924324b210ee0f1a.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Wuhan city page.