LINE Name Country City Regional Rail
Line 3 Phase 2 CN Xiamen No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2020 22.6 16.8 74% 13 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
15154.0 CNY 0.24 2016 3621.9 160.3 Plan
REFERENCE http://www.gov.cn/xinwen/2016-10/13/5118393/files/fc4eeffb973d4e0297ef1fb6bcaa4e73.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.