LINE Name Country City Regional Rail
Line 12 Phase 1 CN Zhengzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
17.04 17.04 100% 12 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
12600.0 CNY 0.24 2019 3001.4 176.2 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201904/W020190910670741123314.pdf; https://zhuanlan.zhihu.com/p/84554499
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.