LINE Name Country City Regional Rail
Line 10 Phase 2 CN Chengdu No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2029 26.7 10.4 38% 9 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
13156.0 CNY 0.25 2016 3298.1 123.5 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zdgc/201607/W020190910671924062945.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.