LINE Name Country City Regional Rail
Line 30 Phase 1 CN Chengdu No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2024 24.78 24.78 100% 24 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
19112.0 CNY 0.24 2019 4552.6 183.7 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201908/W020190905497973740066.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.