LINE Name Country City Regional Rail
Line 8 Phase 1 CN Chengdu No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2020 27.4 27.4 100% 22 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
21863.0 CNY 0.24 2016 5225.4 190.7 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zdgc/201607/t20160715_1146086.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.