Transit Costs Project Final Report

Bibliography

Aevaz, Romic, Brianne Eby, Paul Lewis, and Robert Puentes. N.d. “Saving Time and Making Cents: A Blueprint for Building Transit Better.” Washington D.C.: Eno Center for Transportation. https://projectdelivery.enotrans.org/wp-content/uploads/2021/07/Saving-Time-and-Making-Cents-A-Blueprint-for-Building-Transit-Better.pdf.

Alstom. Financial report. Half-year. As of 30 September 2019, 2019. https://www.alstom.com/sites/alstom.com/files/2019/11/05/H1%2019-20%20Fin%20Report%20ENG.pdf

Altaylı, Birsel, Ezgi Erkoyun. “Mayor Says Turkish State Banks Shut Out Istanbul After Poll Win.” Reuters, November 25, 2019. https://www.reuters.com/article/us-turkey-politics-İmamoğlu-financing-idUSKBN1XZ1HI

Altinkaya, Ayla, “Cultural differences in international projects: A research study at Ericsson,” master’s thesis (Chalmers University and Northumbria University, 2006), https://publications.lib.chalmers.se/records/fulltext/25690.pdf.

ANAC. (2015). Deliberazione n. 51 del 24 giugno 2015. Rome.

Andersen, Søren, “Design-build Contracts in the Nordic Countries,” Nordic Road Association (NVF) reports, Danish Road Directorate 2018, https://nvfnorden.org/wp-content/uploads/2020/10/2018_Design-Build-Contracts-in-the-Nordic-Countries.pdf.

Andreassen, Tor Arne, “Fakta om innvandring til Sverige, som svenskene ikke vil snakke om,” Aftenposten, December 6 2014, https://www.aftenposten.no/verden/i/m2Al/fakta-om-innvandring-til-sverige-som-svenskene-ikke-vil-snakke-om.

Arcadis. 2016. “International Construction Costs 2016.” https://www.arcadis.com/en-us/knowledge-hub/perspectives/global/international-construction-costs.

———. 2017. “International Construction Costs 2017: Cost Certainty In An Uncertain World.” https://www.arcadis.com/en-us/knowledge-hub/perspectives/global/international-construction-costs.

Arkitera. “3 metro hattı için 1.6 milyar Euro kredi [1.6 billion Euro loan for 3 metro lines].” Arkitera, June 17, 2008. https://v3.arkitera.com/h30341-3-metro-hatti-icin-16-milyar-euro-kredi.html

Asal, Maher, “Is there a bubble in the Swedish housing market?”, Journal of European Real Estate Research vol. 12 (1) (April 2019), https://www.emerald.com/insight/content/doi/10.1108/JERER-03-2018-0013/full/html.

Austin Holley, Mary. 1833. Texas. Observations, Historical, Geographical and Descriptive. Baltimore: Armstrong & Plaskitt. https://babel.hathitrust.org/cgi/pt?id=mdp.69015000005534&view=1up&seq=9&skin=2021&q1=acre.

Autodesk. “AEC Excellence Awards 2018.” Accessed September 17, 2021. https://www.autodesk.com/solutions/bim/hub/aec-excellence-2018

Balaban, Osman. “İnşaat sektörü neyin lokomotifi? [The construction industry is the engine of what ?].” Birikim, no.270 (2011):19-26. https://birikimdergisi.com/dergiler/birikim/1/sayi-270-ekim-2011-sayi-270-ekim-2011/2444

Balbay, Mustafa. “Türkiye’de müteahhit sayısı: 453 bin 497 Almanya’da: 3 bin 550 [The number of contractors in Turkey is 453,497, in Germany, 3,550].” Cumhuriyet, January 28, 2020. https://www.cumhuriyet.com.tr/yazarlar/mustafa-balbay/turkiyede-muteahhit-sayisi-453-bin-497-almanyada-3-bin-550-1716733

Barone, Vincent. 2017. “Second Avenue Subway’s Inaugural Ride Led by Cuomo on New Year’s Eve.” AM New York, January 1, 2017. https://www.amny.com/transit/second-avenue-subway-s-inaugural-ride-led-by-cuomo-on-new-year-s-eve-1-12834956/.

Batur, İrfan, Muammer Koç. “Travel Demand Management (TDM): Case Study for Social Behavioral Change Towards Sustainable Urban Transportation in Istanbul.” Cities, no.69 (2017): 20–35. https://doi.org/10.1016/j.cities.2017.05.017

BBC Türkçe. “Kadir Topbaş: Üç kez İBB Başkanı seçilip istifa eden Erdoğan’ın yol arkadaşı [Kadir Topbaş: Erdoğan’s seatmate who was elected three times and forced to resign].” BBC Türkçe, February 13, 2021. https://www.bbc.com/turkce/haberler-turkiye-56057208

Becerra, Hector. n.d. “Forgotten Graves Unearthed.” Los Angeles Times. https://www.latimes.com/archives/la-xpm-2005-nov-22-me-bones22-story.html.

Bencks, Jarret. “Green Line Begins Extension Project.” The Boston Globe, December 12, 2012. https://www.bostonglobe.com/metro/2012/12/12/green-line-extension-gets-underway-somerville/gL8GXvUXtTDuipBoxuhoiI/story.html.

Bengtsson, Håkan A., “The Swedish Model: Conflict or Consensus?”, Arena Idé (October, 2013), https://arenaide.se/rapporter/ha%CC%8Akan-a-bengtsson-the-swedish-model-conflict-or-consensus/.

Bennett, Christopher. 2008. “Second Avenue Subway – A Status Report.” AREMA Conference Proceedings.

Beria, P. (2007). Transport megaprojects in Italy. A comparative analysis of economic feasibility studies into EIAs.

Bernitz, Ulf. “What is Scandinavian Law? Concept, Characteristics, Future.” In What Is Scandinavian Law?, edited by Peter Wahlgren, 13-29. Stockholm: Stockholm Institute for Scandinavian Law, Law Faculty, Stockholm University, 2007, https://www.scandinavianlaw.se/pdf/50-1.pdf.

Beyazit-Ince, Eda, Kenan Aksular,  Mazdak Sadeghpour, and Ipek Yargic. Netherlands Enterprise Agency (RVO) Fact-Finding Study Pre-PPS: Smart and Green Mobility in Istanbul, 2020. https://www.rvo.nl/sites/default/files/2020/11/IAN-Turkey.pdf

Bilgin, Ayla. “Analysis of the Environmental Impact Assessment (EIA) Directive and the EIA decision in Turkey.” April 2015. Environmental Impact Assessment Review, no. 53 (2015) 40–51.

Boman, Björn, “PISA Achievement in Sweden From the Perspective of Both Individual Data and Aggregated Cross-Country Data,” Frontiers in Education vol. 6 (2022), https://www.frontiersin.org/article/10.3389/feduc.2021.753347.

Bolotnyy, Valentin, and Shoshana Vasserman. 2019. “Scaling Auctions as Insurance: A Case Study in Infrastructure Procurement.” Working Paper. https://scholar.harvard.edu/bolotnyy/publications/scaling-auctions-insurance-case-study-infrastructure-procurement.

Bonini Baraldi, Sara, Daniel David Shoup and Luca Zan. “When megaprojects meet archaeology: a research framework and case study from Yenikapı, Istanbul.” International Journal of Cultural Policy, Issue 24, no:4 (2017): 423,444. https://doi.org/10.1080/10286632.2017.1343307

Börjesson, Maria, R. Daniel Jonsson, and Mattias Lundberg, “An ex-post CBA for the Stockholm Metro,” Transportation Research Part A: Policy and Practice vol. 70 (December, 2014), pp. 135-148, https://www.transportportal.se/swopec/CTS2013-34.pdf.

Born, Molly. 2012. “18 Years and $523 Million Later, North Shore Connector Set to Go.” Pittsburgh Post-Gazette, May 24, 2012.

Britten, Liam. 2020. “TransLink Wins Appeal in Long-Running Court Battle over Canada Line Impacts.” News. CBC, May 14. https://www.cbc.ca/news/canada/british-columbia/translink-canada-line-court-1.5570987.

Bunten, Devin. 2017. “Is the Rent Too High? Aggregate Implications of Local Land-Use Regulation.” FEDS Working Paper, June, 1–44.

Burroughs, David. “Pandemic Fails to Slow China’s High-Speed Network Expansion.” International Railway Journal, August 2020. https://www.railjournal.com/in_depth/pandemic-fails-slow-chinas-high-speed-network-expansion.

Button, Kenneth, Soogwan Doh, Matthew H. Hardy, Junyang Yuan, and Xu Zhou. 2010. “The Accuracy of Transit System Ridership Forecasts and Capital Cost Estimates.” International Journal of Transport Economics 37, no. 2 (June): 155–68.

Büyükşahin, Taylan. “Kadir Topbaş’a istifa baskısı [Kadir Topbaş pressured into resigning].” Sözcü, July 29, 2017. https://www.sozcu.com.tr/2017/ekonomi/kadir-topbasa-istifa-baskisi-1951321/

California High-Speed Rail Authority. 2022a. “High-Speed Rail Reaches Construction Milestone in Kern County.” California High-Speed Rail Authority. July 8, 2022. https://hsr.ca.gov/2022/07/08/photo-release-high-speed-rail-reaches-construction-milestone-in-kern-county/.

———. 2022b. “High-Speed Rail Releases Summer 2022 Construction Update.” California High-Speed Rail Authority. July 18, 2022. https://hsr.ca.gov/2022/07/18/news-release-high-speed-rail-releases-summer-2022-construction-update/.

Calise, R. (2021). La metropolitana europea. La Linea 1 di Napoli nell’ambito della politica comune dei trasporti.

Cantarelli, Chantal, Bent Flyvbjerg, Bert van Wee, and Eric Molin. 2010. “Lock-in and Its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects.” Environment and Planning B: Planning and Design 37, no. 5 (May): 792–807. https://doi.org/10.1068/b36017.

Cantarelli, Chantal, David Ogelthorpe, and Bert van Wee. 2022. “Perceived Risk of Lock-in in the Front-End Phase of Major Transportation Projects” 49: 703–33. https://doi.org/10.1007/s11116-021-10191-7.

Cats, Oded, Qian Wang, and Yu Zhao, “Identification and classification of public transport activity centres in Stockholm using passenger flows data,” Journal of Transport Geography vol. 48 (October, 2015), pp. 10-22, https://www.sciencedirect.com/science/article/abs/pii/S0966692315001386.

CD, C. d. D. (2009). Relazione della giunta per le autorizzazioni. Richiesta di deliberazione in materia di insindacabilità, ai sensi dell’articolo 68, primo comma, della costituzione, nell’ambito di un procedimento contabile nei confronti di Francesco de Lorenzo, Giulio di Donato e Ugo Grippo.

CdC. (2011). Metropolitana di Roma (Linea C). (Deliberazione n. 21/2011/G). Rome.

CdC. (2017a). La linea 1 della metropolitana di Napoli. (Deliberazione 28 dicembre 2017, n. 20/2017/G). Rome.

CdC. (2017b). Lo stato di realizzazione dei sistemi di trasporto rapido di massa a guida vincolata e di tranvie veloci nelle aree urbane (L. 26 febbraio 1992, n. 211). (4/2017/G). Rome.

CEB. “Marmaray (commuter rail upgrading).” Accessed March 9, 2022. https://coebank.org/en/project-financing/projects-approved-administrative-council/marmaray-commuter-rail-upgrading/

Çekmeköy Haber. “Ümraniye metro inşaatında göçük davasında karar [Ruling on the Ümraniye Sinkhole Lawsuit]” Çekmeköy Haber. November 25, 2020.http://www.cekmekoyhaber.com.tr/umraniye/umraniye-metro-insaatinda-gocuk-davasinda-karar-h23532.html

CEQ. CEQ EIS Timeline Data, 2020.

———. Environmental Impact Statement Timelines (2010-2017), 2018.

Cervero, Robert, “Sustainable new towns: Stockholm’s rail-served satellites,” in Cities vol. 12 (1) (February, 1995), pp. 41-51, https://www.sciencedirect.com/science/article/abs/pii/026427519591864C.

Chan, Sewell. 2005. “Citing Cuts, M.T.A. Chief Sees Delay on Big Projects.” The New York Times, April 29, 2005. https://www.nytimes.com/2005/04/29/nyregion/citing-cuts-mta-chief-sees-delay-on-big-projects.html?searchResultPosition=199.

———. 2009. “Second Avenue Subway’s Economic Impact.” City Room: Blogging From the Five Boroughs (blog). February 3, 2009. https://archive.nytimes.com/cityroom.blogs.nytimes.com/2009/02/03/the-second-avenue-subways-economic-impact/.

Chung, Jen. 2004. “Co-Op to MTA: No Second Avenue Subway Stop Here.” Www.Gothamist.Com. July 14, 2004. https://gothamist.com/news/co-op-to-mta-no-second-avenue-subway-stop-here.

Citizens Budget Commission. 2019. “Mandatory Debarment of MTA Contractors Is Bad Policy and Must Be Changed.” Https://Cbcny.Org/. December 12, 2019. https://cbcny.org/advocacy/mandatory-debarment-mta-contractors-bad-policy-and-must-be-changed.

City of Copenhagen, “62 % af københavnerne cykler til arbejde og uddannelse,” archived July 7 2019, accessed June 30 2022, https://web.archive.org/web/20190707123514/https://www.kk.dk/indhold/62-af-koebenhavnerne-cykler-til-arbejde-og-uddannelse.

City of New York. n.d. “Vision Zero.” Www.Nyc.Gov. n.d. https://www1.nyc.gov/content/visionzero/pages/.

Colacem.“Listino Prezzi [Price list].” 2016 https://www.colacem.com/media/userfiles/files/Listino_2016.pdf

Cour des Comptes. 2017. “La Société du Grand Paris: Communication à la commission des finances, de l’économie générale et du contrôle budgétaire de l’Assemblée nationale,” December. https://www.ccomptes.fr/sites/default/files/2018-01/20170117-rapport-societe-grand-Paris_1.pdf.

CPTUT. Türkiye’de Sendikalaşma, Toplu İş Sözleşmesi Kapsamı ve Grevler (2013-2019) [Unionization, Coverage of Collective Contracts and Strikes in Turkey (2013-2019)]. February, 2019. https://docplayer.biz.tr/124850211-Sendikalasma-arastirmasi-turkiye-de-sendikalasma-toplu-is-sozlesmesi-kapsami-ve-grevler.html

Cumhuriyet. 2020a. “İşte Hazine’nin onay vermediği 3 metro hattı [The three metro lines that the Treasury has not approved].” Cumhuriyet, January 14, 2020. https://www.cumhuriyet.com.tr/haber/iste-hazinenin-onay-vermedigi-3-metro-hatti-1714368

Cumhuriyet. 2020b. “İmamoğlu’ndan Kanal İstanbul Açıklaması: İstanbul’un En Büyük Felaketi Olacak [Channel Istanbul Statement From İmamoğlu: It Will Be Istanbul’s Biggest Disaster].” Cumhuriyet, July 8, 2020. https://www.cumhuriyet.com.tr/haber/İmamoğlundan-kanal-istanbul-aciklamasi-istanbulun-en-buyuk-felaketi-olacak-1750253

Daganzo, Carlos. 2010. “Structure of Competitive Transit Networks.” Transportation Research Part B: Methodological 44 (4): 434–46. https://doi.org/10.1016/j.trb.2009.11.001.

DBEIS (UK). “Monthly Statistics of Building Materials and Components.” no:539, January 2020. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/862926/20-cs2_-_Construction_Building_Materials_-_Bulletin_January_2020.pdf

De Weck, Joseph. “Germany Is Finally Ready to Spend.” Foreign Policy, June 22, 2020. https://foreignpolicy.com/2020/06/22/germany-covid19-pandemic-stimulus-spending-savings-glut-europe/.

Demircan, Kamil. İki̇telli̇-Ataköy Rayli Si̇stem Hattı, Mali ve Ekonomik Fizibilite Etüdü Güncellemesi [İkitelli-Ataköy Rail Line Financial and Economic Feasibility Study Update].  Istanbul: İstanbul Ulaşım A.Ş. Proje Müdürlüğü [Istanbul Transportation Projects Directorate]. January 1, 2015.

Dermani, Emilio, Jesper Lindé and Karl Walentin, “Is there an evident housing bubble in Sweden?”, Sveriges Riksbank Economic Review vol. 2 (2016), pp. 7-55, https://www.riksbank.se/globalassets/media/rapporter/pov/filer-fore-2017/artiklar/rap_pov_artikel_1_160922_eng.pdf.

DESGAP. Prices, Wages & Index Numbers: 2018 -19. 2019. https://core.ap.gov.in/cmdashboard/Download/Publications/PricesWagesIndexNumbers%202018-19.pdf

Dilulio Jr., John. 2014. Bring Back the Bureaucrats: Why More Federal Workers Will Lead to Better (and Smaller!) Government. West Conshohocken, PA: Templeton Press.

DİSK-AR [The Research Center of the Confederation of Progressive Trade Unions of Turkey]. “Sendikalaşma Araştırması: Türkiye’de Sendikalaşma [Unionization Research: Unionization in Turkey].” February 27, 2019. https://docplayer.biz.tr/124850211-Sendikalasma-arastirmasi-turkiye-de-sendikalasma-toplu-is-sozlesmesi-kapsami-ve-grevler.html

Donohue, Pete. 2008. “MTA Projects Likely to Face Budget Cuts.” New York Daily News, January 29, 2008. https://web.archive.org/web/20080201175341/http://www.nydailynews.com/news/2008/01/29/2008-01-29_mta_projects_likely_to_face_budget_cuts.html.

———. 2009. “’You Can Hold Me Accountable ’: MTA Construction Chief Says No More Delays to Second Ave. Subway.” New York Daily News, July 22, 2009. https://web.archive.org/web/20090725173312/https://www.nydailynews.com/ny_local/2009/07/22/2009-07-22_you_can_hold_me_accountable_mta_construction_chief_says_no_more_delays_to_second.html.

DPA.  “Mevzuat [Statute Law].” Resmî Gazete, no.29900, November 26, 2016. https://www.resmigazete.gov.tr/eskiler/2016/11/20161126.htm

———. “Yönetmelik [Bylaw]” Resmî Gazete, no.27159 (Mükerrer), March 4, 2009. https://www.resmigazete.gov.tr/eskiler/2009/03/20090304M1-1.htm

EBRD. “Istanbul Metro Project.” Accessed September 17, 2021. https://www.ebrd.com/work-with-us/projects/psd/istanbul-metro-project.html

EIB. “Environmental and Social Data Sheet.” 2016. https://www.eib.org/attachments/registers/67772986.pdf

El Instituto Nacional de Estadística [The National Institute of Statistics]. “Estadística del Cemento [Cement Statistics].” Accessed August 1, 2021. https://www.ine.es/dyngs/IOE/es/operacion.htm?id=1259945999670

Eliasson, Jonas, “The Stockholm congestion pricing syndrome: How congestion charges went from unthinkable to uncontroversial,” Working papers in Transport Economics 2014:1, CTS – Centre for Transport Studies Stockholm, https://www.transportportal.se/swopec/CTS2014-1.pdf.

Eliasson, Jonas, Maria Börjesson, James Odeck, and Morten Welde, “Does Benefit-Cost Efficiency Influence Transport Investment Decisions?”  Journal of Transport Economics and Policy vol. 49 no. 3 (July, 2015), pp. 377-396, https://ideas.repec.org/a/tpe/jtecpo/v49y2015i3p377-396.html.

Elkind, Ethan. Railtown: The Fight for the Los Angeles Metro Rail and the Future of the City. University of California Press, 2014.

Emlak Kulisi. “İstanbul’da 2029 hedefi: 622.15 kilometre raylı sistem ağı! [2029 target in Istanbul: 622.15 kilometers of rail system network!].” Emlak Kulisi, February 7, 2021. https://emlakkulisi.com/istanbulda-2029-hedefi-62215-kilometre-rayli-sistem-agi/663748

English, Jonathan. 2021. “Derailed: The Postwar End of New York City Subway Expansion.” Journal of Urban History 47 (4): 832–48. https://journals-sagepub-com.ezproxy.cul.columbia.edu/doi/10.1177/0096144219896578.

Enman, Scott. 2019. “Coney Island Station’s Pricy Solar Panels Have Been Dark for 7 Years. No One Knows When They’re Coming Back.” Brooklyn Daily Eagle, November 22, 2019. https://web.archive.org/web/20200321015044/https://brooklyneagle.com/articles/2019/11/22/coneys-subway-solar-panels-went-dark-after-only-7-years-theyre-still-off-the-grid-today/.

Eno Center for Transportation. “Five Takeaways from Eno’s Transit Capital Construction Database.” Accessed April 1, 2021. https://www.enotrans.org/enotransitcapitalconstructiondatabase/.

Fagerlund, Göran. “NOVACEM : Magnesiumbaserat cement med gynnsam miljöprofil – bedömning av cementets potential TVBM [Magnesium-based cement with a favorable environmental profile – assessment of the cement’s potential TVBM] (Internal 7000 report)”, Lunds Technical University. 2011. https://portal.research.lu.se/portal/en/publications/novacem–magnesiumbaserat-cement-med-gynnsam-miljoeprofil–bedoemning-av-cementets-potential(a5661d60-52bd-499c-b3d3-2ca61dde79ea).html#Overview

Federal Transit Administration.  2002. “Annual Report on Funding Recommendations: Fiscal Year 2003.”

———. 2007. “Annual Report on Funding Recommendations: Fiscal Year 2008.”

———. 2013. “Second Avenue Subway Project Technical Memorandum No. 11.” United States Department of Transportation. https://www.transit.dot.gov/about/regional-offices/region-2/second-avenue-subway-project-technical-memorandum-no-11.

———. 2022. “Second Avenue Subway Phase 2.” https://www.transit.dot.gov/sites/fta.dot.gov/files/2022-01/NY-New-York-Second-Avenue-Subway-Phase-2-Eng-Profile.pdf.

———. “Annual Report on Funding Recommendations: Fiscal Year 2014 Capital Investment Grant Program,” 2013. https://www.transit.dot.gov/sites/fta.dot.gov/files/FY14_Annual_Report_on_Funding_Recommendations.pdf.

———. “Bipartisan Infrastructure Law.” https://www.transit.dot.gov/, n.d. https://www.transit.dot.gov/BIL.

———. “National Transit Database.” Accessed April 1, 2021. https://www.transit.dot.gov/ntd.

———. N.D. “Full-Funding Grant Agreements Guidance.” N.D. https://www.transit.dot.gov/regulations-and-guidance/fta-circulars/full-funding-grant-agreements-guidance#general.

“Finance Committee Meeting.” 2012. New York. http://web.mta.info/mta/news/books/archive/120227_1245_Finance.pdf.

Finder, Alan. 1991. “Cuomo Ideas for New York City: Some Are Old, Some Are New.” The New York Times, September 25, 1991, sec. A.

“First and Avenue and Second Avenue Select Bus Service.” N.D. Www.Nyc.Gov. N.D. https://www1.nyc.gov/html/brt/html/routes/first_ave.shtml.

Fitzsimmons, Emma, Emily Palmer, Noah Remnick, Daniel E. Slotnick, and Jonathan Wolfe. 2017. “Highlights From the Opening of the Second Avenue Subway.” The New York Times, January 1, 2017. https://www.nytimes.com/2017/01/01/nyregion/second-avenue-subway-opening-upper-east-side-manhattan.html?searchResultPosition=3.

Flyvbjerg, Bent. 2022. “Make Megaprojects More Modular.” Harvard Business Review, December 2021. https://hbr.org/2021/11/make-megaprojects-more-modular.

Flyvbjerg, Bent and Dan Gardner. 2023. How Big Things Get Done: The Surprising Factors That Determine The Fate Of Every Project, From Home Renovations To Space Exploration And Everything In Between. New York: Currency.

Flyvbjerg, Bent, Nils Bruzelius, and Werner Rothengatter, Megaprojects and Risk: An Anatomy of Ambition (Cambridge: Cambridge University Press, 2003).

Flyvbjerg, Bent. “Five Misunderstandings About Case-Study Research.” Qualitative Inquiry 12, no. 2 (April 2006): 219–45. https://doi.org/DOI: 10.1177/1077800405284363.

Garcia, Cardiff, “The remarkable productivity stagnation of the US construction sector,” Financial Times, April 15 2014, https://www.ft.com/content/1bbb4931-a5e8-3970-bbd8-dad76f03913a.

Giordano, Lizz. 2022. “Citing Community Concerns Seattle Makes No Recommendation On Chinatown-ID Light Rail Route.” PubliCola, June 30, 2022. https://publicola.com/2022/06/30/citing-community-concerns-seattle-makes-no-recommendation-on-chinatown-id-light-rail-route/.

Globe Newswire by Notified. “Successful closing of €776 million financing in favour of the Istanbul Metropolitan Municipality for financing the Kadıköy-Kartal Metro Line Project.” Global Newswire by Notified, June 10, 2008. https://www.globenewswire.com/news-release/2008/07/10/1754784/0/en/Successful-closing-of-EUR-776-million-financing-in-favour-of-the-Istanbul-Metropolitan-Municipality-for-financing-the-Kadikoy-Kartal-Metro-Line-Project.html

Google Maps a. Accessed September 12, 2021. https://www.google.com/maps/@41.0133094,28.9757337,3a,75y,50.35h,96.64t/data=!3m6!1e1!3m4!1sYVuG2ZEk9wqtbeLQUMBhBg!2e0!7i16384!8i8192

Google Maps b. Accessed September 12, 2021. https://www.google.com/maps/@41.0135687,28.9781048,3a,90y,337.48h,103.56t/data=!3m6!1e1!3m4!1s1cI6KcaXN5ovtA2iXtqU6g!2e0!7i13312!8i6656

Goolsbee, Austan, and Chad Syverson. 2023. “The Strange and Awful Path of Productivity in the U.S. Construction Sector.” https://www.nber.org/system/files/working_papers/w30845/w30845.pdf.

Green Line Extension Hearing (2011).

“Green Line Extension Project Advisory Group Meeting.” Somerville, MA, October 2007.

Grove, Josie. “MBTA Presents Redesigned Community Path Extension.” The Somerville Times, April 20, 2016. https://www.thesomervilletimes.com/archives/66788.

Gupta, Arpit, Stijn Van Nieuwerburgh, and Constantine Kontokosta. 2022. “Take the Q Train: Value Capture of Public Infrastructure Projects.” Journal of Urban Economics 129: 1–26. https://doi.org/rehttps:// doi.org/10.1016/j.jue.2021.103422.

Güvemli, Özlem. 2020a. “Hazinenin onay vermediği 3 metro hattı belli oldu! [The three metro lines that the treasury has not approved are revealed.]” Sözcü, January 14, 2020. https://www.sozcu.com.tr/2020/ekonomi/hazinenin-onay-vermedigi-3-metro-hatti-belli-oldu-5567713/

———. 2020b. “AKP dosyaları 1.5 yıl bekletti, Anadolu yakasında 10 günlük hafriyat alanı kaldı [AKP holds up the case for 1.5 years, 10 day-capacity remains in Asian side muck yards.]” Sözcu, November 20, 2020. https://www.sozcu.com.tr/2020/gundem/akp-dosyalari-1-5-yil-bekletti-anadolu-yakasinda-10-gunluk-hafriyat-alani-kaldi-6133928/

Harris, Connor. 2018. “Why Building Trains in New York Costs More than Any Other City.” New York Post, August 25, 2018. https://nypost.com/2018/08/25/why-nyc-is-priciest-city-in-the-world-for-infrastructure-projects/.

Hårsman, Björn and John Quigley, “Political and Public Acceptability of Congestion Pricing: Ideology and Self-Interest in Sweden,” Access vol. 38 (spring 2011), https://www.accessmagazine.org/spring-2011/political-public-acceptability-congestion-pricing-ideology-self-interest-sweden/.

Haughney, Christine. 2012. “Financing for M.T.A. Projects Is Shored Up.” The New York Times, March 27, 2012, sec. A.

Hecksher, Ben. 2011. “The MTA’s Workshop.” The Launch Box. December 7, 2011. http://thelaunchbox.blogspot.com/2011/12/mtas-workshop.html.

HKL Annual Report 2016, accessed June 30 2022, https://www.hel.fi/static/liitteet/hkl/HKL_toimintak_EN_2017._pienennetty.pdf.

HKL Annual Report 2019, accessed June 30 2022, https://www.hel.fi/static/liitteet-2019/Kymp/HKL/tiivistelma_eng.pdf.

Hook, Walter. 1994. “Role of Nonmotorized Transportation and Public Transport in Japan’s Economic Success.” Transportation Research Record 1441: 108–15.

Hopkins, Emily. “Nowhere to Runoff: Somerville’s Flooding Problem.” Scout Somerville, November 18, 2015. https://scoutsomerville.com/nowhere-to-runoff-somervilles-flooding-problem/.

Horodniceanu, Michael. 2009. “Re: Structural Stability of the Buildings alongside the Second Avenue Subway Construction between 92nd and 96th Streets,” July 27, 2009. http://1.bp.blogspot.com/_tjgTAe0iBhA/Sp10y20SCzI/AAAAAAAACag/JL9GnZ2q47U/s1600-h/MTA+LTR+1-2.jpg.

———. 2017. “Lessons from the Second Avenue Subway and Other Megaprojects.” Presented at the CityLaw Breakfast, April 6. https://www.citylandnyc.org/citylaw-breakfast-michael-horodniceanu-mta-construction/.

Hsieh, Chang-Tai, Moretti, Enrico. 2015. “Why Do Cities Matter? Local Growth and Aggregate Growth.” Kreisman Working Paper Series in Housing Law and Policy, Working Papers, 36.

İBB [Istanbul Metropolitan Municipality]. “Istanbul a Leading City in Rail System Construction.” Accessed August 1, 2021. http://web.archive.org/web/20200809120108/https:/www.ibb.istanbul/en/News/Detail/1344

——— . “İstanbul Metropoliten Alani Kentsel Ulaşim Ana Plani (İUAP) [Istanbul Metropolitan Area Urban Transportation Master Plan (ITMP)].” May, 2011. https://ibb.gov.tr/tr-TR/kurumsal/Birimler/ulasimPlanlama/Documents/%C4%B0UAP_Ana_Raporu.pdf

———.“Kadiköy-Kartal Metro Hatti 144 Adet Metro Araci Alimi İşi [Kadıköy-Kartal Metro Line 144 Metro Vehicle Purchase Work].”March 10, 2010. https://web.archive.org/web/20131012020325/http:/www.ibb.gov.tr/tr-TR/SubSites/raylisistemler/Pages/kadikoy-kartal120.aspx

———. “Mayor Topbaş attending the TBM welding ceremony at the Cobancesme launch box [image].” https://www.ibb.istanbul/Uploads/2017/8/AU0I7276.jpg

——— . “M3 and M9 connection [map]”. May 5, 2021. https://www.metro.istanbul/duyuru/detay/m3-kirazli-basaksehir-metrokent-hattinda-isletme-degisikligi

———. “Yıllara Göre Hat Bazlı Yolculuk Sayıları [Yearly Ridership Numbers of Transit Lines].” Accessed February 2, 2022. https://www.metro.istanbul/Content/assets/uploaded/Hatlar%C4%B1n%20Y%C4%B1llara%20G%C3%B6re%20Ayl%C4%B1k%20Yolcu%20Say%C4%B1lar%C4%B1-TR.pdf

IBISWorld. “Price of Cement : Business Environment Profiles – United States”, IBISWorld. Accessed August 1, 2021. https://www.ibisworld.com/us/bed/price-of-cement/190/

İETT [Istanbul Electric Tram and Tunnel Administration]. “İstanbul`da Toplu Ulaşım: 2019 [Public Transportation in Istanbul: 2019].” Accessed August 1, 2021. https://www.iett.istanbul/tr/main/pages/istanbulda-toplu-ulasim/95.

Île de France Mobilitiés. n.d. “Prolongement Du Métro Ligne 1 à Val de Fontenay.” Https://Val-de-Fontenay.Metro-Ligne1.Fr. n.d. https://val-de-fontenay.metro-ligne1.fr/download/fiches_thematiques/L1_Fiche_Coût-projet.pdf.

ILO. “Statistics On Safety And Health At Work: Occupational safety and health indicators.”  Accessed August 1, 2021. https://ilostat.ilo.org/topics/safety-and-health-at-work/

IMM Transportation Department Transit Planning Directorate. “Mahmutbey- Bahçeşehir Raylı Sistem Hattı Mali ve Ekonomik Fizibilite Etüdü [Mahmutbey- Bahçeşehir Rail System Line Financial and Economic Feasibility Study].” March 2018.

Implenia 2015, “Citybanan Projekt Odenplan & Vasatunnel,” accessed June 30 2022, https://implenia.com/de-de/referenzen/detail/ref/citybanan-projekt-odenplan-vasatunnel/#EUR.

IRSDC “Form – 10: Eligible Assignments of Applicant.” Accessed August 1, 2021. https://irsdc.in/sites/default/files/ov84w1AppendixIFORM10.pdf

Jamal, Haseeb. “AASHTO Soil Classification System – AASHTO Chart.” AboutCivil, October 1, 2019. https://www.aboutcivil.org/aashto-soil-classification-system

JICA. “A New Bridge of Friendship between Turkey and Japan.”, January 24, 2014. https://www.jica.go.jp/english/news/field/2013/140124_01.html

Jonsson, Claes-Mikael, Thord Pettersson, Håkan Löfgren, and Kristoffer Arvidsson. 2014. “When Labour Costs Squeeze the Price.” LO. https://www.lo.se/home/lo/res.nsf/vRes/lo_in_english_1366027847830_when_labour_costs_webb_pdf/$File/When%20labour%20costs_webb.pdf.

Kabak, Benjamin. “SAS Neighborhood Impact: Ventilation Structures.” Second Avenue Sagas, December 1, 2009. https://secondavenuesagas.com/2009/12/01/the-sas-neighborhood-impact-ventilation-structures

Kam, Ali. “M5 Üsküdar – Çekmeköy Metro Hattı Google Earth Turu [M5 Üsküdar – Çekmeköy Metro Line Google Earth Tour][screenshot].” YouTube, MetrocuAli, March 31, 2021. https://www.youtube.com/watch?v=vBIbXMV2YSQ&t=186s

Karpat, H. Kemal. The Gecekondu, 1976.

Kennedy, Randy. 1995. “Experts Offer a Wish List to Improve Transportation on the East Side.” The New York Times, July 27, 1995, sec. B.

Lapp, Katherine. 2004. “RE: Playground 96,” June 18, 2004.

Lean Construction, “Construction Productivity in Decline,” June 2014, accessed June 30 2022, https://leanconstruction.org/uploads/wp/media/docs/PEJune14_Construction.pdf.

Lee, Denny. 2002. “Neighborhood Report: East Side; Like a Flying Dutchman, 2nd Ave. Subway Reappears.” The New York Times, February 3, 2002. https://www.nytimes.com/2002/02/03/nyregion/neighborhood-report-east-side-like-a-flying-dutchman-2nd-ave-subway-reappears.html?searchResultPosition=92.

Lindbloom, Mike. 2004. “Light-Rail Tunnel Estimate $41 Million Short, but Money Is There.” The Seattle Times, May 15, 2004. https://archive.seattletimes.com/archive/?date=20040515&slug=tunnel15m.

Lindgren Strömbäck, Karin, “Det krävs handkraft när Micke borrar för nya tunnelbanan,” Seko Tidingen, January 29 2021, https://sekotidningen.se/reportage/det-kravs-handkraft-nar-micke-borrar-for-nya-tunnelbanan/.

Love, Peter and Dominic D. Ahiaga-Dagbui, “Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects,” Transportation Research Part A: Policy and Practice vol. 113 (2018), pp.357-368, https://www.sciencedirect.com/science/article/abs/pii/S0965856417306158.

Love, Peter, Dominic D. Ahiaga-Dagbui, and Zahir Irani, “Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation,” Transportation Research Part A: Policy and Practice vol. 92(C) (2016), pp. 184-194, https://ideas.repec.org/a/eee/transa/v92y2016icp184-194.html.

Love, Peter, Jim Smith, Ian Simpson, Michael Regan, and Oluwole Olatunji, “Understanding the Landscape of Overruns in Transport Infrastructure Projects,”  Environment and Planning B: Urban Analytics and City Science, vol. 42(3) (2015), https://journals.sagepub.com/doi/abs/10.1068/b130102p.

Lueck, Thomas. 1999. “Officials Cite Costly Hurdles to Second Avenue Subway Plan.” The New York Times, March 12, 1999, sec. B.

Lunardi, P., Cassani, G., & De Giudici, C. (2008). La Metropolitana di Napoli. Strade e Autostrade, 2, 147-156.

MacFarquhar, Neil. 1999. “Straphangers Assail Plan To Ease East Side Crush.” The New York Times, August 17, 1999, sec. B.

Maddison Project Database, version 2020 by Jutta Bolt and Jan Luiten van Zanden, accessed June 30 2022, https://www.rug.nl/ggdc/historicaldevelopment/maddison/releases/maddison-project-database-2020?lang=en

Mai, M. G. (2009). TRASforma urbis. Metropolitane storiche a Milano 1909-2009: Maggioli Editore.

Maloney, Carolyn. 2000. “Maloney Says No Way To Stubway: Maloney Hails Speaker’s Bold Measures One Second Avenue Subway.” March 17, 2000. https://maloney.house.gov/media-center/press-releases/maloney-says-no-way-stubway-maloney-hails-speakers-bold-measures-second-avenue-subway.

———. 2009. “Second Avenue Subway Report Card.” September 15, 2009. https://maloney.house.gov/sites/maloney.house.gov/files/documents/local/2ndavesubway/20090925FirstAnnualSecondAvenueSubwayReportCardReport.pdf.

Maloney, Jennifer, and Andrew Grossman. 2011. “Air Quality Worries Halt Subway Blasts.” The Wall Street Journal, November 23, 2011. https://www.wsj.com/articles/SB10001424052970204531404577054853475270804.

Mandell, Svante and Jan-Eric Nilsson, “A Comparison of Unit Price and Fixed Price Contracts for Infrastructure Construction Projects,”  Working Papers 2010:13, Swedish National Road & Transport Research Institute (VTI), https://www.researchgate.net/publication/241759399_A_Comparison_of_Unit_Price_and_Fixed_Price_Contracts_for_Infrastructure_Construction_Projects.

Mandolini, A., & Viggiani, G. M. (2017). Experiences gathered from the construction of napoli underground. Procedia Engineering, 172, 31-41.

Manning, Sean. 2012. “Sandhogs Tunneling Under Second Avenue.” The Village Voice, April 11, 2012. https://www.villagevoice.com/2012/04/11/sandhogs-tunneling-under-second-avenue/.

Mas Ivars, Diego, Fredrik Johansson Rima Ghazal, Abel Sánchez Juncal Roció Batres Estrada, “A Case Study of the Odenplan Station in the Stockholm City Link Project – Analysis of In-Situ Stresses and Obsrved Ground Behaviour,” BeFo Report 139 (Stockholm, 2016), http://www.befoonline.org/UserFiles/Archive/700/BeFo_Report_139_webb.pdf.

Massachusetts Bay Transportation Authority. “Beyond Lechmere Northwest Corridor Study: Cambridge, Somerville, Medford, Massachusetts.” Major Investment Study/Alternatives Analysis, 2005.

———. “GLX CM/GC Procurement Manual,” November 20, 2012.

Massachusetts Department of Transportation. “BRG Look Back Study (Draft),” December 2015.

———. “Final Environmental Impact Report.” Massachusetts, 2010.

———. Resolution of Both Boards on the Green Line Extension (2015).

Melis Maynar, Manuel, “Madrid Metro and Railway Infrastructure 1995-2003,” in Metrosur 2nd Edition – Commuting in the 21st Century (Madrid, 2003), pp. 2-6, https://tunnelbuilder.com/metrosur/edition2pdf/page2.pdf.

Metro İstanbul. n.d.-a. “Yıllara Göre Hat Bazlı Aylık Yolcu Sayılari [Monthly Number of Passengers per Line by Years].” Accessed August 1, 2021. https://www.metro.istanbul/Content/assets/uploaded/Y%C4%B1llara-G%C3%B6re-Hat-Bazl%C4%B1-Ayl%C4%B1k-Yolcu-Say%C4%B1lar%C4%B1.pdf

——— . n.d.-b. “M4.” Accessed February 1, 2021. https://www.metro.istanbul/Hatlarimiz/HatDetay?hat=M4

Metropolitan Transportation Authority. 2001. “Annual Report 2000.” http://web.mta.info/mta/investor/pdf/annualfull2000.pdf.

———. 2004. “Final Environmental Impact Statement (FEIS).” Metropolitan Transportation Authority. https://new.mta.info/project/second-avenue-subway-phase-2/final-eis.

———. 2006. “Amendment: MTA 2005-2009 Capital Program.”

———. 2010. “MTA Board Action Items: January 2010.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/100127_0930_Board.pdf.

———. 2017. “Safety Committee Meeting.” http://web.mta.info/mta/news/books/archive/171213_0830_Safety.pdf.

———. 2018. “MTA Board Action Items: September 2018.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/180926_0900_Board.pdf.

———. 2019a. “MTA Capital Program 2020-2024: Rebuilding New York’s Transportation System.” https://new.mta.info/document/10511.

———.2019b. “Mega Projects: Second Avenue Subway Phase I.” http://web.mta.info/capitaldashboard/CPDMega.html.

———. 2022. “Second Avenue Subway, Phase 1.”  https://new.mta.info/project/second-avenue-subway-phase-1.

———. 2013b. “MTA Board Action Items: April 2013.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/130424_1000_Board.pdf.

———. 2016a. “MTA Board Action Items: February 2016.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/160224_1000_Board.pdf.

———. 2013a. “MTA Board Action Items: January 2013.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/130130_0930_Board.pdf.

———. 2011a. “MTA Board Action Items: March 2011.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/110323_0930_Board.pdf.

———. 2016b. “MTA Board Action Items: March 2016.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/160224_1000_Board.pdf.

———. 2017a. “MTA Board Action Items: March 2017.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/170322_1000_Board.pdf.

———. 2011b. “MTA Board Action Items: May 2011.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/110525_0930_Board.pdf.

———. 2012a. “MTA Board Action Items: November 2012.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/121128_0930_Board.pdf.

———. 2012b. “MTA Board Action Items: September 2012.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/120927_0930_Board.pdf.

———. 2017b. “Safety Committee Meeting: December 2017.” Metropolitan Transportation Authority. http://web.mta.info/mta/news/books/archive/171213_0830_Safety.pdf.

Metropolitana Milanese spa, M. (1980). MM. Venticinque anni della Metropolitana Milanese spa.

Metzger, Andy. “Green Line Extension Cost Is Going Up Several Million Dollars.” The Boston Globe, September 13, 2014. https://www.bostonglobe.com/metro/2014/09/12/green-line-extension-cost-going-several-billion-dollars/qdo8A4RwS6rFNcbOoiElKN/story.html.

Milner, Greg. n.d. “Nobody Knows What Lies Beneath New York City.” Bloomberg Businessweek. https://www.bloomberg.com/news/features/2017-08-10/nobody-knows-what-lies-beneath-new-york-city.

Minici, G. L. (2018). La metropolitana milanese. Evoluzione, urbanistica e architettura.: Silvana Editoriale.

Ministry of Finance, National Public Procurement Strategy, 2016, https://www.government.se/4aba88/contentassets/9ec42c71c00442a39d67169d3c25faed/national-public-procurement-strategy.pdf.

Ministry of Foreign Affairs of Japan. “Projects and Programs by Country and Region.” Accessed September 30, 2021. https://www.mofa.go.jp/policy/oda/region_index.html

Ministry of Transport and Communications: “An Evaluation of the Finnish Public Transport System: The Role of the Ministry of Transport and Communications,” February 2003, accessed June 29 2022, https://julkaisut.valtioneuvosto.fi/bitstream/handle/10024/78443/1_16_2003.pdf.

Moe, Ingeborg and Gunnar Kagge, “Mener Danmark er blitt et skrekkeksempel,” Aftenposten, June 10 2021, https://www.aftenposten.no/verden/i/zgv7Wb/mener-danmark-er-blitt-et-skrekkeksempel.

MTA Capital Construction. 2008. “Second Avenue Subway Project: Community Board 8.” Presented at the Second Avenue Subway Task Force, June 17. https://web.archive.org/web/20140408215418/http:/web.mta.info/capconstr/sas/documents/CB8%20presentation%2006-17-08.pdf.

———. 2009. “Results of Comprehensive Project Reviews: Second Avenue Subway & East Side Access.” Presented at the MTA Capital Construction, Planning and Real Estate Committee, July 22. https://www.scribd.com/document/17582918/Second-Avenue-Subway-Review.

———. 2011. “Community Board Eight Project Update.” February 15. http://web.mta.info/capital/sas_docs/2011_Feb%2015_Final.pdf.

———. 2011a. “Quarterly Report: Second Avenue Subway Phase 1.” Metropolitan Transportation Authority. http://web.mta.info/capital/sas_docs/Second%20Avenue%20Subway-%20Quarterly%20Report%202011%20Q1.pdf.

———. 2011b. “Quarterly Report: Second Avenue Subway Phase 1: July, August and September 2011.” Metropolitan Transportation Authority.

———. n.d. “Second Avenue Subway.” MTA Capital Construction. n.d. https://web.archive.org/web/20100823233852/http:/www.mta.info/capconstr/sas/update.html.

MTA Construction & Development. n.d. “Second Avenue Subway Phase 2: Update to Community Board 11 Land Use Committee.” http://www.cb11m.org/wp-content/uploads/2018/03/CB11-4.14.21-SAS-2-Update-final2.pdf.

MTA New York City Transit. 2001. “Manhattan East Side Transit Alternatives (MESA)/Second Avenue Subway Summary Report.”

Munfah, Nasri, and Paul Nicholas. 2020. “Why Tunnels in the US Cost Much More Than Anywhere Else in The World?” Tunnel Business Magazine, August 12, 2020. https://tunnelingonline.com/why-tunnels-in-the-us-cost-much-more-than-anywhere-else-in-the-world/.

Murray, Patty. 2002. Department of Transportation and Related Agencies Appropriation Bill, 2003. https://www.google.com/books/edition/Department_of_Transportation_and_Related/yQwtSeAx11QC?hl=en&gbpv=1&dq=%22capital+program%22+%22second+avenue+subway%22&pg=PA134&printsec=frontcover.

Murteza, Mustafa. Feasibility Study of Rail Investment And Construction Methods. Master’s thesis, Bahçeşehir University, 2010. http://acikerisim.bahcesehir.edu.tr:8080/xmlui/bitstream/handle/123456789/337/084913C1.pdf?sequence=1

Namako, Tom. 2009. “Bracing for 2nd Ave. Subway.” New York Post, October 22, 2009. https://nypost.com/2009/10/22/bracing-for-2nd-ave-subway/.

Namlı, Mücahit. “Effect of The Project Revisions on Project Cost And Duration of Üsküdar-Ümraniye-Cekmekory Metro Project.” Omer Halisdemir University Journal of Engineering Sciences, Volume 7, Issue 1, (2018), 190-196.

National Association of Counties. 2022. “Legislative Analysis for Counties: The Bipartisan Infrastructure Law.” https://www.naco.org/resources/legislative-analysis-counties-bipartisan-infrastructure-law.

Neuman, William. 2007. “Ground Broken Yet Again for 2nd Avenue Subway.” The New York Times, April 12, 2007. https://www.nytimes.com/2007/04/12/nyregion/12cnd-tunnel.html.

New York City Department of Transportation. n.d.a. “First And Second Avenue Select Bus Service: M15 Select Bus Service Began on October 10, 2010.” n.d.a. https://www.nyc.gov/html/brt/html/routes/first_ave.shtml.

———. n.d.b. “Green Light: Sustainable Street Lighting for NYC.” https://www1.nyc.gov/html/dot/downloads/pdf/sustainablestreetlighting.pdf.

New York City Parks Department. n.d. “Second Avenue Subway Street Tree Planting Restitution for Removed Trees.” Nycgovparks.Org. https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6188.

New York City Planning. n.d. “Population Density by Neighborhood Tabulation Area New York City, 2010.” n.d. https://www1.nyc.gov/assets/planning/download/pdf/data-maps/nyc-population/census2010/m_pl_p2_nta.pdf.

New York City’s Mayor’s Office of Sustainability. 2014. “New York City’s Roadmap to 80 x 50.” https://www1.nyc.gov/assets/sustainability/downloads/pdf/publications/New%20York%20City%27s%20Roadmap%20to%2080%20x%2050_Final.pdf.

Nilsson, Jan-Eric and John Nyström, “Mapping railways maintenance contracts – the case of Netherlands, Finland and UK,” VTI note 27A-2014, Swedish National Road & Transport Research Institute (VTI), http://diva-portal.org/smash/record.jsf?faces-redirect=true&dswid=4894.

Nilsson, Jan-Eric, “Projekteringsupphandling i nya former: förstudie,” Swedish National Road and Transport Research Institute, Society, environment and transport, Transport economics Stockholm (2011), https://www.diva-portal.org/smash/record.jsf?pid=diva2%3A675426&dswid=5327.

Nobbe, Patrizia, and Joseph Berechman. 2013. “The Politics of Large Infrastructure Investment Decision-Making: The Case of the Second Avenue Subway.” http://www.utrc2.org/sites/default/files/pubs/final-2nd-ave-subway-study.pdf.

Nordic Council of Ministers, “Transport Infrastructure Investment: Climate and Environmental Effects in Cost-Benefit Analysis in the Nordic Countries,” March 2021, https://www.toi.no/getfile.php/1356349-1622720954/mmarkiv/Hannes%20mappe%202020/2021/TemaNord_2021-521_%209789289370172_Transport%20infrastructure%20investment.pdf.

NYC Department of Buildings. 2009. “OATH/ECB Violation Summary.” https://a810-bisweb.nyc.gov/bisweb/ECBQueryByNumberServlet?requestid=2&ecbin=34789339L.

“NYS Board of Elections Governor Election Returns Nov. 3, 1998.” n.d. https://www.elections.ny.gov/NYSBOE/elections/1998/GOVWEB-98.pdf.

Ocak, Hazal. “Dış Borçla Metro Hattı Yapılacak [Metro Line Will Be Built With Foreign Debt].”Cumhuriyet, March 19, 2016. https://www.cumhuriyet.com.tr/haber/dis-borcla-metro-hatti-yapilacak-501086

Ocak, İbrahim. “Analysis For Taking Kadıköy-Kartal Rail System To Underground”, İstanbul Üniv. Müh. Fak. Yerbilimleri Dergisi, Issue 19, no:1 (2006): 77,89. https://dergipark.org.tr/tr/download/article-file/173691

OECD Fiscal Decentralisation Database 2020, “Tax autonomy of state and local government,” 2000-2018, accessed June 30 2022, https://www.oecd.org/tax/federalism/fiscal-decentralisation-database/.

Office of the Comptroller, City of New York. 2010. “Labor Law §220 Prevailing Wage Schedule.” Comptroller.Nyc.Gov. January 11, 2010. https://comptroller.nyc.gov/wp-content/uploads/documents/220-schedule2009-2010.pdf.

Osipova, Ekaterina, “The impact of procurement options on risk management in Swedish construction projects,” research report, Luleå University of Technology (2008), http://www.diva-portal.org/smash/record.jsf?pid=diva2%3A997810&dswid=-6528.

Öz, Ali. Analysis of Excavation Performance of The Tunnel Boring Machine (TBM) Used In İstanbul-Kadiköy-Kartal Metro Tunnel. Master’s thesis, Dokuz Eylul University Graduate School of Natural and Applied Sciences, 2012. https://polen.itu.edu.tr/handle/11527/9767

Palma, B. (1972). Metropolitana difficile. Capitolium, 2-3, 9-24.

Perez-Pena, Richard. 2000. “Assembly Speaker Links Subway to Budget Vote.” The New York Times, March 15, 2000. https://www.nytimes.com/2000/03/15/nyregion/assembly-speaker-links-subway-to-budget-vote.html.

“Personal Correspondence NY A.” 2022, May 2022.

“Personal Correspondence NY B.” November 2022.

“Personal Correspondence NY C.” July 2022.

“Personal Correspondence NY D.” August 2022.

“Personal Correspondence NY E.” May 2022.

“Personal Correspondence TR A.”  November 2021.

“Personal Correspondence TR B.”  December 2021.

“Personal Correspondence TR C.”  March 2022.

Personal Interview IN, April 2020.

Personal Interview IN, May 2020.

Personal Interview IN A, October 2021.

Personal Interview IN B, March 2021.

Personal Interview IN A, August 2022.

Personal Interview IN B, June 2022.

Personal Interview MA, October 2017.

Personal Interview MA, December 2019.

Personal Interview MA A, May 2020.

Personal Interview MA B, May 2020.

Personal Interview MA C, November 2020.

Personal Interview MA D, June 2020.

Personal Interview MA E, August 2020.

Personal Interview MA F, September 2020.

Personal Interview MA G, December 2020.

Personal Interview MA H, November 2020.

Personal Interview MA I, November 2020.

Personal Interview MA J, May 2020.

Personal Interview MA K, July 2020.

Personal Interview MA L, July 2020.

Personal Interview MA M, June 2020.

Personal Interview NY. November 2019.

Personal Interview NY A. August 2021.

———. February 2022.

Personal Interview NY B. March 2021.

———. June 2022.

Personal Interview NY C. April 2021.

———. February 2022.

Personal Interview NY D. April 2021.

———. November 2022.

Personal Interview NY E. December 2021.

———. July 2022.

Personal Interview NY F. August 2021.

———. September 2022.

Personal Interview NY G. August 2021.

———. April 2022.

Personal Interview NY H. March 2021.

———. August 2022.

Personal Interview NY I. December 2021.

———. March 2022.

Personal Interview NY J. January 2021.

———. May 2022.

Personal Interview NY K. March 2021.

———. May 2022.

Personal Interview NY L. February 2021.

———. July 2022.

Personal Interview NY M. June 2021.

———. May 2022.

Personal Interview NY N. January 2021.

———. May 2022.

Personal Interview NY O. October 2021.

———. September 2022.

Personal Interview NY P. August 2021.

———. June 2022.

Personal Interview NY Q. February 2022.

Personal Interview NY R. July 2022.

Personal Interview NY S. January 2022.

Personal Interview NY T. June 2022.

Personal Interview NY U. July 2022.

Personal Interview NY V. February 2022.

Personal Interview NY W. August 2022.

Personal Interview NY X. March 2022.

Personal Interview NY Y. May 2022.

Personal Interview SE A, August 2020.

Personal Interview SE B, March 2021.

Personal Interview SE C, March 2021.

Personal Interview SE D, March 2021.

Personal Interview SE E, April 2021.

Personal Interview SE F, June 2021.

Personal Interview SE G, June 2021.

Personal Interview SE H, July 2021.

Personal Interview SE I, August 2021.

Personal Interview SE J, February-April 2022.

Personal Interview TR A, September 2020.

Personal Interview TR B, September 2020.

Personal Interview TR C, September 2020.

Personal Interview TR D, October 2020.

Personal Interview TR E, October 2020.

Personal Interview TR F, October 2020.

Personal Interview TR G, October 2020.

Personal Interview TR H, October 2020.

Personal Interview TR I, November 2020.

Personal Interview TR J, November 2020.

Personal Interview TR K, November 2020.

Personal Interview TR L, November 2020.

Personal Interview TR M, January 2021.

Personal Interview TR N, January 2021.

Personal Interview TR O, February 2021.

Personal Interview TR P, March 2021.

Personal Interview TR R, April 2021.

Personal Interview TR S, April 2021.

Personal Interview TR T, April 2021.

Personal Interview TR U, April 2021.

Personal Interview TR V, July 2021.

Personal Interview TR W, July 2021.

Personal Interview TR X, August 2021.

Personal Interview TR Y, September 2021.

Personal Interview TR Z, September 2021.

Personal Interview TR AA, November 2021.

Personal Interview TR AB, February 2022.

Plotch, Philip. 2020. Last Subway: The Long Wait for the Next Train in New York City. Ithaca: Cornell University Press.

Pokorny, Carolyn. 2019. “Re: Second Avenue Subway Escalators Outages MTA/OIG #2018-61.” New York: Metropolitan Transportation Authority. https://mtaig.state.ny.us/Reports/18-61.pdf.

Rail Turkey En. “M4 Kadıköy-All Developments in the Eagle Metro Line Process.” Rail Turkey En, June 11, 2012. https://en.rayhaber.com/2012/11/m4-kadikoy-kartal-metro-hatti-surecindeki-tum-gelismeler/

Railly News. “İmamoğlu Listed the Rail System Projects Activated by Found Finances.” Railly News, February 2, 2021. https://www.Railly News.com/2021/02/İmamoğlu-listed-the-rail-system-projects-that-were-activated-by-the-financing-found./

Railway Gazette, “Länsimetro extension opens in Helsinki,” November 20 2017, https://www.railwaygazette.com/projects-and-planning/l%C3%A4nsimetro-extension-opens-in-helsinki/45522.article.

Railway Gazette. “Kadiköy – Kartal metro opened by Prime Minister.” Railway Gazette, August 17, 2012. https://www.railwaygazette.com/kadik%c3%b6y-kartal-metro-opened-by-prime-minister/37207.article

Ray Haber. “Çiğli Tramvayı Yapım İhalesi Sonucu [Çiğli Tram Construction Tender Result].” Rayhaber. October 5, 2020. https://rayhaber.com/2020/11/cigli-tramvayi-yapim-ihalesi-sonucu/

Regional Plan Association. 2018. “Building Rail Transt Projects Better for Less: A Report on the Costs of Delivering MTA Megaprojects.” https://rpa.org/work/reports/building-rail-transit-projects-better-for-less.

Reynolds, Patrick, “Final contract awarded on Gothenburg West Link,” TunnelTalk, June 14 2018, https://www.tunneltalk.com/Sweden-June2018-Final-Gothenburg-West-Link-rail-contract-awarded.php.

Rivoli, Dan. 2017. “MTA Reinforces South Ferry Station with Steel Doors to Shield from Sandy-like Storms.” New York Daily News, October 27, 2017. https://www.nydailynews.com/new-york/south-ferry-new-steel-doors-shield-sandy-like-storms-article-1.3594216.

  1. (2019). Le gallerie della linea C tra la stazione San Giovanni e il pozzo di via Sannio. Retrieved from https://metrocspa.it/blog/le-gallerie-della-linea-c-tra-la-stazione-san-giovanni-e-il-pozzo-di-via-sannio/
  2. (2021a). Il nuovo progetto e il sottoattraversamento della linea A. Retrieved from https://metrocspa.it/il-nuovo-progetto-e-il-sottoattraversamento-linea/
  3. (2021b). Roma Metopolitane. La tutela archeologica, ambientale e dei monumenti. Retrieved from https://www.romametropolitane.it/articolo.asp?CodMenu=10760&CodArt=10802#:~:text=Nel%20sottosuolo%20romano%20il%20cosiddetto,profondit%C3%A0%20di%20circa%2020%20metri.

Robinson, Nicole. 2011. “Moving Forward under Second Avenue.” Tunnels & Tunneling International, May 2011.

Rosenthal, Brian. 2017. “The Most Expensive Mile of Subway Track on Earth.” New York Times, December 28, 2017. https://www.nytimes.com/2017/12/28/nyregion/new-york-subway-construction-costs.html.

Rocheleau, Matt. “A List of the 100 Highest Paid MBTA Workers in 2019.” The Boston Globe, January 7, 2020. https://www.bostonglobe.com/2020/01/07/metro/list-100-highest-paid-mbta-workers-2019/.

Rosenthal, Brian. 2017. “The Most Expensive Mile of Subway Track on Earth.” The New York Times. December 28. https://www.nytimes.com/2017/12/28/nyregion/new-york-subway-construction-costs.html

Rubinstein, Dana. 2017. “Internal Memo: Second Avenue Subway’s Fire Alarm System Offline since May.” Politico.Com. October 19, 2017. https://www.politico.com/states/new-york/albany/story/2017/10/19/internal-memo-second-avenue-subways-fire-alarm-system-offline-since-may-115147.

Ryan, Nicholas. 2020. “Contract Enforcement and Productive Efficiency: Evidence from the Bidding and Renegotiation of Power Contracts in India.” Econometrica 88, no. 2 (March): 383–424. https://doi.org/10.3982/ECTA17041.

Ryan, Nicholas. 2022. “Holding Up Green Energy: Counterparty Risk in the Indian Solar Power Market.” Working paper (August). https://bpb-us-w2.wpmucdn.com/campuspress.yale.edu/dist/5/91/files/2022/10/ryan_holding_up_green_energy_20220819.pdf.

Sabuncuoğlu, Ali O. Effect of construction method selection on work schedule case study: Kadıköy Kartal metro project. Master’s thesis, Mimar Sinan Fine Arts University, Institute of Science and Technology, 2011. https://tez.yok.gov.tr/UlusalTezMerkezi/tezDetay.jsp?id=dq1P_pVzHJPy7Tp4Cnz4iA&no=XhTfxHqKyZIoyR7GrCmjpg

Salminen-Karlsson, Minna, “Swedish and Indian teams: Consensus culture meets hierarchy culture in offshoring.” 7th European Conference on Information Management and Evaluation, ECIME 2013, pp. 147-154, https://www.researchgate.net/publication/292846208_Swedish_and_Indian_teams_Consensus_culture_meets_hierarchy_culture_in_offshoring.

Savaşkan, Osman. “Political dynamics of local government reform in a development context: The case of Turkey.” Politics and Space C, Issue 39, no:1 (2021): 204, 225.

Scauzillo, Steve. 2019. “Dispute over Route Delays Action on North Hollywood-to-Pasedena Rapid Bus Line.” Pasedena Star-News, April 25. https://www.pasadenastarnews.com/2019/04/25/dispute-over-route-delays-action-on-north-hollywood-to-pasadena-rapid-bus-line/.

Schivelbusch, Wolfgang. 1986. The Railway Journey: The Industrialization of Time and Space in the Nineteenth Century. Berkeley: University of California Press.

Schuerman, Matthew. 2009. “MTA Deficit Leads to Simplified 2nd Ave Subway.” WNYC.Org. March 24, 2009. https://www.wnyc.org/story/74949-mta-deficit-leads-to-simplified-2nd-ave-subway/.

“Second Avenue Subway: 72nd St. Station Cavern Mining Contract (C-26007) Summary Report of August 21, 2012 Incident at Ancillary No. 2.” n.d. Metropolitan Transportation Authority.

Sendika.org. “Açılan Marmaray değil, rant ve vizyon için can güvenliği tehdit altında [It is not Marmaray that is opening, safety of life is threatened to serve rant and image.]” Sendika.org. October 28, 2013. https://sendika.org/2013/10/acilan-marmaray-degil-rant-ve-vizyon-icin-can-guvenligi-tehdit-altinda-147043/

Sharp, Sonja, and Amy Zimmer. 2011. “MTA Resumes Second Avenue Subway Blasting.” Www.Dnainfo.Com. December 5, 2011. https://www.dnainfo.com/20111205/upper-east-side/mta-resumes-second-avenue-subway-blasting-decent-early-reviews/.

Shaver, Katherine. 2020. “Purple Line Settlement: Maryland Board Approves $250 Million Legal Deal.” The Washington Post, December 16. https://www.washingtonpost.com/local/trafficandcommuting/maryland-purple-line/2020/12/16/5a370bb8-3fb0-11eb-8bc0-ae155bee4aff_story.html.

Siems, Mathias. Comparative Law: Third Edition (Cambridge: Cambridge University Press, 2022), pp. 86-87.

Siljevall, Anders, “Kontrakt för miljarder – här är alla anbuden inom nya tunnelbanan,” Byggindustrin, November 22 2021, https://www.byggindustrin.se/affarer-och-samhalle/affarer-i-byggsektorn/kontrakt-for-miljarder-har-ar-alla-anbuden-inom-nya-tunnelbanan/.

SILOS. (2021). Sistema Informativo Legge Opere Strategiche. from Camera dei Deputati https://silos.infrastrutturestrategiche.it/

SL Annual Report, “Fakta om SL och länet 2016,” accessed June 30 2022, https://www.regionstockholm.se/globalassets/2.-kollektivtrafik/fakta-om-sl-och-lanet/sl_och_lanet_2016.pdf.

SL Annual Report, “Fakta om SL och länet 2019,” accessed June 30 2022, https://miljobarometern.stockholm.se/content/Trafikrelaterat/sl_och_regionen_2019.pdf.

SLL 2018a, “Planbeskrivning: Utbyggnad av tunnelbana till Nacka och söderort,” May 2018, accessed June 30 2022 https://nyatunnelbanan.se/wp-content/uploads/files/2320-M23-22-00001.pdf.

SLL 2018b, “Planbeskrivning: Tunnelbana till Arenastaden,” June 2018, accessed June 30 2022, https://nyatunnelbanan.sll.se/wp-content/uploads/files/Planbeskrivning_bilagor.pdf.

SLL, “Beslut om Åtgärdsvalsstudie kollektivtrafik till Barkarby och Idéstudie av tunnelbana till Barkarby,” February 2014, accessed June 30 2022, https://nyatunnelbanan.sll.se/wp-content/uploads/files/Akalla-Barkarby-Beslut-om-atgardsvalsstudie-idestudie-kollektivtrafik-barkarby_0.pdf.

SLL, “Sofia station – one of a kind,” November 2016, accessed June 30 2022, https://nyatunnelbanan.se/en/sofia-station-one-kind/.

SLL, “Supplier Day 2021 Presentation 1,” accessed June 30 2022, https://www.nyatunnelbanan.sll.se/wp-content/uploads/files/Supplier%20day%202021%20-%20Session%201%20-%20BIB-s%C3%B6der%20BIB%20Arenastaden.pdf.

Slowey, Kim. “NYC’s Transit Agency Transfers 430 Workers to Construction Division,” December 13, 2019. https://www.constructiondive.com/news/nycs-transit-agency-transfers-430-workers-to-construction-division/568976/.

Smith, Göran, Jana Sochor, and Steven Sarasini, “Mobility as a service: Comparing developments in Sweden and Finland,” Research in Transportation Business & Management vol. 27 (June, 2018), pp. 36-45, https://publications.lib.chalmers.se/records/fulltext/252147/local_252147.pdf.

SNYDL. “Prevailing Wage Schedule For Article 8 Public Work Project.” Accessed September 28, 2021. https://opwdd.ny.gov/system/files/documents/2020/03/prevailing-wage-schedule.pdf

Söderström, Panu, Harry Schulman, and Mika Ristimäki, “Urban Form in the Helsinki and Stockholm City Regions: Development of Pedestrian, Public Transport and Car Zones,” Reports of the Finnish Environment Institute vol. 16 (May, 2015), https://core.ac.uk/download/pdf/33735222.pdf.

Sound Transit. 2021. Resolution No. R2021-05, Pub. L. No. R2021- 05. https://www.soundtransit.org/st_sharepoint/download/sites/PRDA/ActiveDocuments/Resolution%20R2021-05-As%20Adopted%208-5-21.pdf

Sound Transit. n.d. “East Link Extension.” Https://Www.Soundtransit.Org/. https://www.soundtransit.org/system-expansion/east-link-extension.

Spasov, Kristian, “Stockholm 2050 – A resilient metropolitan region,” master’s thesis (TU Delft, 2017), http://resolver.tudelft.nl/uuid:8c13bf4e-f98e-426d-bac3-57137221fb3a.

Spinosa, A. (2019). Metropolitane d’Italia.

Sporveien 2016, “Lørenbanen,” accessed June 30 2022 https://sporveien.com/inter/prosjekter/prosjekt?p_document_id=2639628.

Statistics Sweden 2022a, “Dwelling Stock,” April 2022, accessed June 30 2022, https://www.scb.se/en/finding-statistics/statistics-by-subject-area/housing-construction-and-building/housing-construction-and-conversion/dwelling-stock/.

Statistics Sweden 2022b, “Number of completed dwellings,” June 2022, accessed June 30 2022 https://www.scb.se/en/finding-statistics/statistics-by-subject-area/housing-construction-and-building/housing-construction-and-conversion/new-construction-of-residential-buildings/pong/tables-and-graphs/number-of-completed-dwellings/.

Statistics Sweden, “Rents and general price level 1969-2021,”  October 2021, accessed June 30 2022, https://www.scb.se/en/finding-statistics/statistics-by-subject-area/housing-construction-and-building/housing-and-rent-data/rents-for-dwellings/pong/tables-and-graphs/rents-and-general-price-level-1969—2021/.

Steensig, Sara Lilja, “Sweden’s government could be about to collapse in a row over rent,” Euronews, June 21 2021, https://www.euronews.com/my-europe/2021/06/18/sweden-s-government-could-be-about-to-collapse-in-a-row-over-rent.

Stern, Wendy. “Re: Green Line Extension to Medford Hillside and Union Square Somerville, Medford, and Cambridge,” November 6, 2007.

Sunsirs. “China Cement Spot Price.” SunSirs. Accessed August 1, 2021. http://www.sunsirs.com/uk/prodetail-603.html

Swedish Public Procurement Act (2016:1145), https://www.konkurrensverket.se/globalassets/dokument/informationsmaterial/rapporter-och-broschyrer/informationsmaterial/swedish-public-procurement-act.pdf.

Tabarra, Mohammad, Bulent Özince. “Emergency Ventilation Systems – Cold Flow & Cold Smoke Tests in Tunnels & Underground Stations. [Image]”, September, 2015.

Tamotia, Manas. “South Korea: new strategies – International Report.” International Cement Review, LEK Consulting, March, (2019): 94. https://www.lek.com/sites/default/files/insights/pdf-attachments/International-Cement-Review.pdf

Tankersley, Jim. “Biden Details $2 Trillion Plan to Rebuild Infrastructure and Reshape the Economy.” The New York Times, March 31, 2021. https://www.nytimes.com/2021/03/31/business/economy/biden-infrastructure-plan.html.

Taylor, Christopher, Manuel Martin Ramos, Daniel Weiss, and Luv Sehgal. 2019. “Enhancing Flood Resiliencey of the NYC Subway System.” In Proceedings of AREMA 2019, 579–94.

TCDD Taşımacılık [Turkish State Railways]. “Demiryolu Taşımacılığında Cumhuriyet Tarihinin Rekoru Kırıldı [Historical Record Broken In Railway Transportation].” February 26, 2020. https://www.tcddtasimacilik.gov.tr/haber/402/

——— . “Marmaray Hakkında [About Marmaray].” Accessed September 30, 2021. https://marmaray.gov.tr/marmaray-hakkinda/

Teicholz, Paul, “Labor-Productivity Declines in the Construction Industry: Causes and Remedies (Another Look),” AECbytes issue 67 (2013), https://www.aecbytes.com/viewpoint/2013/issue_67.html.

Teulings, Coen N., Ioulia V. Ossokina, and Henri L. F. de Groot, “Land use, worker heterogeneity and welfare benefits of public goods,” Journal of Urban Economics vol. 103 (January, 2018), pp. 67-82.

The World Bank. “PPP conversion factor, GDP (LCU per international $) – Turkey.” Accessed June 06, 2022. https://data.worldbank.org/indicator/PA.NUS.PPP?locations=TR&most_recent_year_desc=false

The White House. 2022. “Remarks by President Biden on the Bipartisan Infrastructure Law.” https://www.whitehouse.gov/briefing-room/speeches-remarks/2022/10/19/remarks-by-president-biden-on-the-bipartisan-infrastructure-law-6/.

Tingley, Kim. 2012. “Tunneling Below Second Avenue.” The New York Times Magazine, August 1, 2012.

Tirolo Jr., Vincent, Thomas Maxwell, and Anil Parikh. n.d. “Construction of a TBM Launch Box in a Complex Urban Environment.” Mining Engineering 65 (3): 50–55.

The World Bank. “Rise of the Anatolian Tigers: Turkey Urbanization Review.” 2015. https://openknowledge.worldbank.org/bitstream/handle/10986/22388/87180.pdf?sequence=5&isAllowed=y

Tihinen, Dennis, “Det här måste göras för att maxa Citybanan,” Mitti, May 28 2017, https://www.mitti.se/nyheter/det-har-maste-goras-for-att-maxa-citybanan/lmqeB!1560701/.

TMEU. “Birim Fiyat Arşivi [Unit Price Archive].” Accessed September 22, 2021. https://yfk.csb.gov.tr/birim-fiyat-arsivi-i-91569

TMTMC. “Finansman [Financing].” TMTMC. December 12, 2013. https://web.archive.org/web/20131230004039/http://www.marmaray.com.tr/Finansman

Toker, Çiğdem. “İstanbul Metrolarının Geleceği [The Future of Istanbul Metros].” Cumhuriyet, August 17, 2018. https://www.cumhuriyet.com.tr/koseyazisi/1057622/istanbul_metrolarinin_gelecegi.html

Tomtom. “Traffic Index: 2020.” Accessed August 1, 2021. https://www.tomtom.com/en_gb/traffic-index/ranking/ 

Topousis, Tom. 2010. “Rail Shaky Ground.” New York Post, October 26, 2010. https://nypost.com/2010/10/26/rail-shaky-ground/.

Toronto Region Board of Trade. Maximizing Value in Infrastructure Construction, 2020. https://recoverysummits.trbot.ca/transportation-summit/.

Torres-Springer, Jamie. 2022. “MTA Capital Program: Update on Cost Benchmarking & Containment.” Presented at the MTA December Board Meeting, December 21.

Trafikverket, “Procurement of railway infrastructure projects – A European benchmarking study,” June 2016, https://trafikverket.ineko.se/Files/en-US/15106/Ineko.Product.RelatedFiles/2016_121_procurement_of_railway_infrastructure_projects.pdf.

Trafikverket, “Procurement Strategy: The West Link Project,” version 2, August 2014, https://bransch.trafikverket.se/contentassets/dfec181c461243078b0c47830be60c1c/procurement-strategy-contract-works-west-link-141114.pdf.

Trafikverket, Annual Report 2017, https://trafikverket.ineko.se/Files/sv-SE/49148/Ineko.Product.RelatedFiles/2018_086_TRV_Annual%20Report_2017.pdf.

Trafikverket, Annual Report 2019, http://trafikverket.diva-portal.org/smash/get/diva2:1446738/FULLTEXT02.pdf.

Transek, “Samhällsekonomisk bedömning av Citybanan och Ytspåret,” December 2006, accessed June 30 2022, https://www.regeringen.se/49bbbe/contentassets/9055d646df25488e853951dd27f000b5/bilaga-12-samhallsekonomisk-bedomning-av-citybanan-och-ytsparet—transek.

Transit Costs Project. “Transit Costs Project.” Accessed April 1, 2021. www.transitcosts.com.

Transit Costs Project. “Transit Costs Project.” Accessed August 1, 2021. www.transitcosts.com

Transit Costs Project. n.d. “Transit Costs Project: Data.” https://transitcosts.com/data/.

Transport for London. “International Benchmarking Report.” London. Accessed April 1, 2021. http://content.tfl.gov.uk/rup-20160224-part-1-item07-international-benchmarking-report.pdf.

Tunnel Business. “Why Tunnels in The US Cost Much More Than Anywhere Else in The World.” Tunnel Business Magazine, August 18, 2020. https://tunnelingonline.com/why-tunnels-in-the-us-cost-much-more-than-anywhere-else-in-the-world/

Tunnel, “Implenia to Build One of the World’s Deepest Metro Stations in Stockholm,” Issue 2021-03, https://www.tunnel-online.info/en/artikel/tunnel__3654726.html.

Türkiye Gazetesi. “E-5’e Havaray [Airrail for E-5].” Turkiye Gazetesi, 2004. https://m.turkiyegazetesi.com.tr/Genel/a213383.aspx,

Turner & Townsend. 2022. “International Construction Market Survey: 2022.” https://publications.turnerandtownsend.com/international-construction-market-survey-2022/?utm_source=Turner%20%26%20Townsend&utm_medium=email&utm_campaign=13274582_ICMS%202022&utm_content=ICMS%202022%20report%20link&dm_i=1OQJ,7WIQE,AAO76T,WD57D,1.

Ullman, Karolina, “Nordic business culture: What is important to know when negotiating with Swedes,” November 6 2017, accessed June 30 2022, https://www.njordlaw.com/nordic-business-culture-what-important-know-when-negotiating-swedes.

United States Department of Labor. 1930. “Monthly Labor Review.” 1. https://babel.hathitrust.org/cgi/pt?id=umn.31951d029289565&view=1up&seq=3&q1=road

Urban Engineers. 2013. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65336/pmoc-report-secondavesubway-november-2013.pdf.

———. 2016. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Comprehensive Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/64831/pmoc-report-secondavesubway-december-2016.pdf.

———. 2011b. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Comprehensive Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65376/pmoc-report-secondavesubway-september-2011.pdf.

———. 2017a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Comprehensive Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/pmoc-report-secondavesubway-january-2017.pdf.

———. 2010a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65226/pmoc-report-secondavesubway-may-2010.pdf.

———. 2010b. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65181/pmoc-report-secondavesubway-august-2010.pdf.

———. 2010c. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration.

———. 2010d. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65241/pmoc-report-secondavesubway-october-2010.pdf.

———. 2011a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65281/pmoc-report-secondavesubway-february-2011.pdf.

———. 2010e. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Mini Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65191/pmoc-report-secondavesubway-february-2010.pdf.

———. 2011c. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65331/pmoc-report-secondavesubway-march-2011.pdf.

———. 2012a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65421/pmoc-report-secondavesubway-january-2012.pdf.

———. 2014a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65096/pmoc-report-secondavesubway-january-2014.pdf.

———. 2014b. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65071/pmoc-report-secondavesubway-december-2014.pdf.

———. 2015a. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/64911/pmoc-report-secondavesubway-march-2015.pdf.

———. 2017b. “Second Avenue Subway Phase 1 (MTACC-SAS) Project: PMOC Monthly Report.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/pmoc-report-secondavesubway-may-2017.pdf.

———. 2008b. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 December 2008.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65016/pmoc-report-secondavesubway-december-2008.pdf.

———. 2007a. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 January 2007.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/64961/pmoc-report-secondavesubway-january-2007.pdf.

———. 2009a. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 January 2009.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65126/pmoc-report-secondavesubway-january-2009.pdf.

———. 2007b. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 July 2007.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/64966/pmoc-report-secondavesubway-july-2007.pdf.

———. 2009d. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 July 2009.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65131/pmoc-report-secondavesubway-july-2009.pdf.

———. 2009e. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 June 2009.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65141/pmoc-report-secondavesubway-june-2009.pdf.

———. 2008a. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 March 2008.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65046/pmoc-report-secondavesubway-march-2008.pdf.

———. 2009b. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 March 2009.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65151/pmoc-report-secondavesubway-march-2009.pdf.

———. 2009c. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 May 2009.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65156/pmoc-report-secondavesubway-may-2009.pdf.

———. 2007c. “Second Avenue Subway Project Management Oversight Program: Monthly Report – Part 1 September 2007.” Federal Transit Administration. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/foia/65001/pmoc-report-secondavesubway-september-2007.pdf.

Uysal, Onur. “Kadıköy-Kartal-Tavsantepe Metro (M4).” Rail Turkey En, October 15, 2016. https://railturkey.org/2016/10/15/kadikoy-kartal-tavsantepe-metro-m4/

Uzun, Bayram, Mehmet Çete, and Mustafa Palancıoğlu. “Legalizing and upgrading illegal settlements in Turkey.” Habitat International, 34, (2010): 204–209. https://doi.org/10.1016/j.habitatint.2009.09.004

Vie publique. 2020. “Grand Paris Express: Une Estimation Des Coûts En Hausse.” Https://Www.Vie-Publique.Fr/. November 6, 2020. https://www.vie-publique.fr/en-bref/277104-grand-paris-express-augmentation-des-couts.

“Vote Cast for Governor and Lieutenant Governor by Party of Candidates New York State By County — November 8, 1994.” n.d. https://www.elections.ny.gov/NYSBOE/elections/1994/gov94.pdf.

Wanek-Libman, Mischa. “Acciona-Ghella JV Awarded C.$1.7 Billion Contract for Vancouver’s Broadway Subway Project.” Mass Trasnit, September 8, 2020. https://www.masstransitmag.com/rail/infrastructure/article/21153333/accionaghella-jv-awarded-c17-billion-contract-for-vancouvers-broadway-subway-project.

Weaver, Shaye. 2017. “2nd Ave. Subway’s 83rd St. Entrance Closed Due to Broken Escalators.” DNAinfo New York. May 16, 2017. https://www.dnainfo.com/new-york/20170516/yorkville/second-avenue-subway-83rd-street-entrance-exit-closed-escalator-repairs/.

Wickens, Stephen. 2020. “Station to Station: Why Subway-Building Costs Have Soared in the Toronto Region.” Residential and Civil Construction Alliance of Ontario, April. https://www.rccao.com/research/files/RCCAO-STATION-TO-STATION-REPORT-APRIL2020.pdf.

Wowturkey. “İstanbul Havaray Projeleri [Istanbul Airtrain Projects].” Wowturkey. Accessed September 13, 2021. http://wowturkey.com/forum/viewtopic.php?t=8650&start=0

———. “İstanbul Metrosu: M9 Olimpiyat – Ataköy hattı [Istanbul Metro: M9 Olympic – Ataköy line].” Wowturkey [Blog], February 17, 2017. http://wowturkey.com/forum/viewtopic.php?t=142983&start=400

———. “İstanbul Metrosu: M9 Olimpiyat – Ataköy hattı [Istanbul Metro: M9 Olympic – Ataköy line].” Wowturkey [Blog], January 24, 2019. http://wowturkey.com/forum/viewtopic.php?t=142983&start=1110

WPI. “First Destination Outcomes Report, Class of 2020.” Accessed November 19, 2021. https://www.wpi.edu/sites/default/files/inline-image/Offices/Career-Development-Center/CDC_FirstDestinationOutcomesReport_2020_0.pdf

Wynne, Alexandra. 2009. “Fairytale of New York – Second Avenue Subway Takes Shape.” New Civil Engineer, January 20, 2009. https://www.newcivilengineer.com/archive/fairytale-of-new-york-second-avenue-subway-takes-shape-20-01-2009/.

Yackley, Ayla Jean. “Istanbul Mayor Looks Overseas as State Banks Deny Him Funds.” Al-monitor, November 25, 2019. https://www.al-monitor.com/originals/2019/11/istanbul-mayor-seeks-foreign-funding-infrastructure.html

Yeşibag, Melih. “Hegemonyanin Harci: Akp Dönemi̇nde İnşaata Dayali Bi̇ri̇ki̇m Reji̇mi̇ [The Mortar of Hegemony: Construction-Led Accumulation Regime in the AKP Period].” SBF Dergisi, Issue 71, no. 2 (2016): 599 -626. https://doi.org/10.1501/SBFder_0000002404

Zimmer, Amy. 2011a. “Upper East Side Building Sues MTA Over Planned Subway Entrances.” DNAinfo New York. February 16, 2011. https://www.dnainfo.com/20110216/upper-east-side/upper-east-side-building-sues-mta-over-planned-subway-entrances/.

———. 2011b. “No More Second Ave. Night Blasting, MTA Vows.” Www.Dnainfo.Com. August 15, 2011. https://www.dnainfo.com/20110815/upper-east-side/no-more-second-ave-night-blasting-mta-vows/.